- UNMH 3 South Orthopedics -
August 08 - April 09
Included demolition and plumbing rough-in, top-out, and fixture installations for renovation. We renovated and expanded existing plumbing and piping systems as well as replaced medical gas systems. We must work around patients and schedule outages in high traffic areas.
- Dialysis Clinics -
January 06 - June 09
We were responsible for the entire plumbing systems in three Dialysis Clinics in the Albuquerque area. Installed and tested process piping systems at all clinics, must work with existing systems and near patients for some of the clinics.
- Santa Fe Vet Clinic -
August 07 - April 08
A total renovation project from a previous CYFD building into a state-of-the-art veterinary clinic. This project required all new plumbing as sophisticated as a doctor's office, including medical gas and outlets.
- Pre-Natal Care Facility -
August 06 - May07
A new construction state-of-the-art facility with standard doctor's offices. Responsible for plumbing and gas piping and arranging for utility connections.
- UNM Communication & Journalism -
June 06 - March 07
A complete renovation project including heating and cooling process piping, VAV units and all new plumbing fixtures, design build HVAC steam heat exchanges, all water piping was replaced, including fire protection and irrigation systems.